See how Mahaffey has been helping clients face industry challenges with confidence or call 1-855-977-1763 to speak directly to a project manager.
See how Mahaffey delivered an on-site, semi-permanent warehouse solution bigger than a football field to solve this huge EPC company's efficiency dilemma.
Innovative refrigerated storage space delivers critical solution for pharmaceutical company. See how Mahaffey delivered the right solution, fast.
See how Mahaffey built -up- with its extreme weather MTS™ industrial fabric structure to get a major food manufacturer operating at full capacity.
Mahaffey’s long-standing reputation of delivering fast, turnkey temporary structures for various branches of the military made them the perfect choice.
Nothing stops Mahaffey's expert teams from getting it done right. See how we pivoted to deliver for a major food-processor's 13 facilities nationwide.
For hospitals in the midst of COVID-19 — space matters. See how Mahaffey’s expert crews deployed emergency temporary medical space in a health crisis.
Super Series™ is right for the job. See how Mahaffey kept a major engineering firm project on track with rapid temporary warehouse install and relocation.
The experts at Mahaffey have done it all — including installing temporary fabric structures over a skyscraper. See how Mahaffey made it happen.
The U.S. Military called on Mahaffey to solve an urgent need amidst pandemic. See how our fabric structures redefined recruit-housing post-Coronavirus.
When a NY firehouse needed an emergency structure, they turned to Mahaffey. This fast turnaround install kept the squad covered in northern winter temps.
The Mahaffey Gateway keeps employees safe in the era of COVID. See how this innovative thermal-screening checkpoint got an auto manufacturer back to work.
Need a temporary airplane hangar to protect your fleet during construction or renovation? See how mahaffeyusa.com helped the Navy.
Have an urgent need for a dining tent solution? Mahaffey's temporary fabric structure kept a college dining hall up and running. See how at mahaffeyusa.com
Need a temporary airplane hangar for a project? See how mahaffey.usa solves urgent repair mission with a turnkey fabric structure.
Do you have an urgent turnaround project like this fire station? See how Mahaffey helped solve the problem!
Keep your scheduled maintenance on track with a quick-install fabric building. See how Mahaffey can help.
Mahaffey temporary fabric lunch tents can improve worksite productivity. See how we helped a job site stay on-schedule with a quick-install solution.
Mahaffey tackles environmental remediation containment project with innovative fabric structure. Find out how Mahaffey can help with your project.
Mahaffey provides a solution for an 8-billion-dollar pipeline project in the Midwest to expedite on-site inspections and decrease installation time.
Mahaffey's Temporary Structures provide turnkey solutions for Marine One Fleet
Mahaffey conquers toxic threat to water supply by providing a temporary containment solution.
A global luxury-car manufacturer faced a massive backlog in production. The customer demand for luxury vehicles far exceeded the plant’s capacity and production pace. Preordered vehicles were “sold” before they rolled off the assembly line and droves of anxious customers awaited their arrival. Local dealerships anticipated disaster with impending delivery dates and urged the manufacturer to find a fast fix to the problem.
Long-haul trucks are the transport giants of the highways. Vehicles used to deliver America's produce, dry goods, automobiles and livestock are worth their weight in gold to distributors. They are also in high demand. The surge in demand for these wheeled titans landed a global manufacturer on the hot seat.
When every minute counts, choose a fabric structure partner with experience, a vast inventory, and boots on the ground rapid-response capabilities.
Mahaffey has years of experience installing temporary firehouses and extreme weather structures that can be installed and operational in just a few days.
Summer's rising temperatures do not have to halt productivity with Mahaffey's custom amenities in temporary fabric structures.
Mahaffey's quick turn around time saves productivity after placing temporary fabric structure post hurricane.
Valentin Alvarez of Ancos took a few minutes to talk to us about how Mahaffey temporary warehousing cut storage costs and improved their project bottom line.
For a nuclear power plant, it was imperative to find an immediate way to protect its equipment from the harsh elements. Having worked with Mahaffey on a different project years prior, the client knew Mahaffey’s reputation and their team’s ability to solve any problem.
Many businesses face the pains of expansion. Temporary warehouse storage is a definite need to stay at capacity.
A multi-billion-dollar discount retailer was embarking on a renovation that included interior and exterior remodeling and updates for all stores nationwide, and they needed a partner experienced in both temporary storage solutions and project management, capable of coordinating multiple moving parts and meeting precise deadlines. They chose Mahaffey Fabric Structures.
2018 brought exciting, out-of-the-box solutions that deserve a second look, including projects for environmental containment, manufacturing and new construction or expansion with amenity-rich, semi-permanent features. Let’s take a look at five different industrial tent customizations that made 2018 an unforgettable year.
A data center located in the Northeast had an expansion project worth millions of dollars and it was getting off to a rocky start. The lunch tent structure installed by a local vendor was proving unreliable. The structure proved too flimsy for the seasonal rains and winds and proved to be a sub-par product for the intended purpose.
A large, nationally recognized construction company decided to find an alternative vendor in the midst of managing multiple expansion projects.
While undergoing a billion dollar expansion, a luxury car manufacturer turned to temporary fabric structures to solve a distribution challenge. But with so much invested in the expansion, an immediate solution was critical. Mahaffey rose to the challenge.
After partnering with Mahaffey, a plant experiencing heavy production found a way to continue operations while utilizing fabric structures.
A bustling New England township had a local fire station that was bursting at the seams. After several years of stops and starts, the city was finally ready to move forward with a multi-million-dollar construction project to build a new fire station. The plan included demolition of the existing building and rebuilding the new structure on the same site.
A 200 man lunch tent was designed specifically for large company located in Texas. A clear span tent was used to construct this temporary fabric structure.
A Fortune 500 car manufacturer had an assembly line problem with one of their most popular models at one of their busiest assembly plants. Due to a fire, a major supplier of theirs was unable to deliver parts critical to finishing the company’s well-known SUV model series. The plant moved ahead with the assembly of the vehicles but had to park them with the intention of adding the final parts when the supplier delivered. Time dragged on.
The MegaStructure™ is made of industrial fabric, is engineered to withstand winds up to 130 mph and is ideal for semi-permanent applications. It was an excellent choice for the wind farm construction site.
Mahaffey Tension Series (MTS™) warehouse structures are ideal for long-term use and are incredibly versatile in a variety of conditions. Standard off-the-shelf MTS™ semi-permanent warehouse structures are engineered to withstand winds up to 130 mph and snow loads up to 30 lbs. per sq. foot.
The challenge for the marketing group was creating an environment that amplified the brand of their client and created a perfect environment to impart the brand’s new sales vision for the future. They needed a venue conductive to helping attendees maintain focus and spend quality time teambuilding through daytime meetings and evening activities. It was important that no one leave the premises until it was time to be transported back to their hotels in the evenings.
A massive number of hot steel products required for the project needed an immense covered staging zone. Nothing currently existed on site to protect the beams from the elements while they cooled and until it was time for shipping to the construction site. This called for an ideal solution…FAST.
To avoid an environmental breach with serious legal and financial repercussions, the factory team needed an economical solution to store and protect the scrap bins from the elements. It needed to be installed quickly and have the flexibility to be relocated if necessary.
The greatest challenge for the hotel owners was meeting the expectations of business as usual in a temporary structure. They needed a conference center with multiple spaces, and they required the same amenities expected for events such as weddings, dinners and more formal meetings.
Mahaffey designed and built a stunning event venue without compromising amenities or the overall guest experience. Our team transformed a concrete slab used for parking construction vehicles into a full-service event venue in under five days.
One popular annual outdoor music festival was gearing up for a fun-filled, sun-soaked time at their usual venue, and they were ready to begin planning. As return customers of Mahaffey, they contacted us with one overall request: make the festival bigger and better than ever! Mahaffey was up to the challenge.
Mahaffey Fabric Structures could not have been more excited to be chosen as a partner to provide temporary fabric structures to protect event equipment and guests at the MLK50 Anniversary here in Memphis, TN.
When a local fire department experienced an internal fire it set the community on edge. The accident left city officials scrambling to find a quick solution to get the fire station up and running. Learn about Mahaffey's fast-response temporary firehouse solution in this case study.
Learn how Mahaffey's temporary fabric structure helped a bank cover their roof and keep their doors open during a major restoration.
When Mahaffey arrived on-site for an installation, it was discovered that one of the 15 concrete foundations the client’s contractor poured for the lunch tent fabric structure was not the size the client ultimately needed. Learn about our creative problem solving approach for this unique challenge.
Mahaffey recently designed and installed a can't-miss trade show display structure for a major manufacturer and distributor of strength and conditioning equipment. The 7,500-sq.-foot structure featured massive 20' glass walls. Learn more in our case study.
Learn how Mahaffey was a gap solution for a manufacturing facility for a top supplier of turbine blades. The company needed room to grow and couldn’t stop blade production during the construction of their expanded facility.
Mahaffey proved to be a valuable partner for designing and creating an impressive, show-stopping branded platform within a stunning temporary structure display area for a large utility and construction equipment company at a prominent international exposition.
At a recent international trade show, a custom temporary structure display helped this client stand out!
Mahaffey recently completed a large environmental remediation project with a well-known environmental company in a busy West Coast city.
Mahaffey partnered with companies from a variety of industries to provide a turnkey temporary base camp and disaster relief tents for business continuity.
Custom temporary structure covers world's largest gas engine and crane during assembly.
Scheduled disruptions can impact business continuity and overall profits, but unforeseen natural disasters can throw a wrench in an already chaotic situation.
After massive flooding in southern Louisiana, Mahaffey was called to the rescue to provide a clearspan structure.
Mahaffey has over twenty years’ experience helping environmental remediation companies provide innovative site shelter and containment solutions for major environmental projects. The Mahaffey Tension Series (MTS™) was no exception.
Mahaffey stepped up to challenge with an innovative solution featuring a Mahaffey Tension Series (MTS) instant structure outfitted with a Mahaffey Xtension™ door.
Mahaffey’s turnkey project management allows our customers to focus on their business operations and let Mahaffey handle every other detail.
A Fortune 500 company needed a massive blast-resistant structure in compliance with API RP 756. The answer for this project was a Max 756 structure.
Mahaffey has a long history of making the impossible possible. This one of a kind portable structure was unique in all ways.
Needing immediate space, Mahaffey provided this defense solutions provider with a temporary structure in less than one week.
The Manhattan Matrix provided its client with a distinctive, state-of-the-art event space that drew a crowd throughout the three-day expo.
In October 2016, Mahaffey got the chance of a lifetime to contribute to the restoration of a Vietnam helicopter, thanks to a close partnership with Bombardier.
The purpose of the project was to create a site for a sit down rehearsal dinner for over 350 guests along with a dance and reception area.
United States Postal Service uses 10 on-site, temporary warehouse structures to make holiday shipping easy and increase efficiency.
Tennessee and the Mid-South enlist the help of Mahaffey for high performing military structures
Mahaffey Creates A Custom Pool Cover Fit For All Seasons
Mahaffey Fabric Structures Responds to a 36 Hour Emergency Installation
Texas Aquarium Uses Mahaffey Fabric Structures to Provide Temporary Penguin Facility During Renovations
See how Mahaffey Fabric Structures uses an enormous tent to expedite a nuclear plant project.
Mahaffey Fabric Structures helps provide a semi-permanent hangar structure for Midcoast Aviation.
A northwestern tool engineering company in the United States, contacted us with a need for a structure that could be rolled over and off of a small manufacturing site in Gainsville, Texas.
Mahaffey uses clearspan structures to create a large, prestigious event space for Centennial Celebration "Celebrating a Century of Technology".
Mahaffey Covers the American Presidential Experience at the 2012 Democratic National Convention (DNC), in Charlotte, North Carolina.
Mahaffey’s nine-man crew spent almost three weeks working on creating the temporary structures for this long-standing LPGA tour.
Mahaffey wins IFAI Outstanding Achievement Award for "Winners Summit" Tradeshow Exhibit in Puerto Rico.
Mahaffey Fabric Structures uses a double-decker structure to create a spectacular tradeshow exhibit space that entertained and amazed all those who experienced it.
Mahaffey Fabric Structures provide a state-of-the-art event space to entertain guests while putting on a spectacular luau show in Honolulu, Hawaii.
Mahaffey Fabric Structures helps a renowned power company in need of several structures for environmental remediation projects.
Mahaffey was recently contacted by a leading wind turbine company to discuss a new facility and the warehouse space needed to accommodate product overflow.
In 2015, Mahaffy installed a164’ x 278’ clear span fabric building for a corporate event in Palo Alto, CA.
See how Mahaffey created a temporary hangar for a Naval Air Station allowing them to continue with a renovation project.
In 2014, Mahaffey installed a temporary structure for a firehouse in Goldens Bridge New York after the existing firehouse was destroyed in a fire.
Learn what steps you can take to ensure that your next winter project runs smoothly.
Mahaffey helps keep the smells in and the media out for large Environmental Remediation project.
Mahaffey helps construct an efficient on-site storage facility for pipeline manufacturing project
Blast resistant lunch tent facilities installed for Gulf Coast procurement project
Mahaffey installs a multi-use fabric structure to be used as a temporary business continuity tent in Texas
Mahaffey Installs a Complex Construction Building for Texas Drilling R&D Facility
Mahaffey installs customized manufacturing structures for Pet Food Company.
Mahaffey helps an American multinational brand experience agency oversee the final R&D phases of a large corporate event.
Mahaffey helps a Gulf Coast Port house approximately 700 cruise ship passengers with three custom-made manufacturing structures.
Mahaffey was called by an environmental remediation company to assist with a project where a negative pressure tent was needed to prevent contaminated soil fumes.
When a large hurricane hit the gulf coast, Mahaffey responded with temporary buildings and services within a rapid response.
Mahaffey created a temporary warehouse for an automotive parts manufacturer in TN saving them the cost and lost time while building additional space.
See how Mahaffey created a temporary aircraft hangar for a large aviation manufacturer.
Mahaffey Fabric Structures is the leading provider of industrial tent rentals in North America and the Caribbean. Our versatile inventory allows customers to choose a sensible economic alternative to conventional buildings.
Headquarters
4161 Delp Street
Memphis, TN 38118
(855) 977-1763
sales@mahaffeyusa.com
Nashville Office
4604 Illinois Avenue
Nashville, TN 37209
(615) 205-6572
Northeast Office
158 Redwood Dr
Quakertown, PA 18951
(267) 214-0321
Houston Depot
7650 CR 48, Ste. F
Rosharon, TX 77583
(281) 377-6993